Petrojam Waste Water Plant
371
portfolio_page-template-default,single,single-portfolio_page,postid-371,bridge-core-3.0.9,qi-blocks-1.2.5,qodef-gutenberg--no-touch,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-29.7,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.13.0,vc_responsive,elementor-default,elementor-kit-8
 

Petrojam Waste Water Plant

Category
Civil Infrastructure

Project Overview

The Petrojam Limited refinery was upgraded from a simple hydro-skimming plant to a conversion facility. The purpose of the upgrade was to expand the refinery capacity from 35,000 to 50,000 barrels per day and to convert Heavy Fuel Oil (HFO) into more valuable light products through the use of mature proven technology. The upgraded refinery required the addition of a suitable waste water treatment plant for which FCS Consultants Limited was a part of the design team and also involved in the monitoring of the implementation.